CASE STUDIES / SUBSIDIES PORTAL
GOV SECTORPORTAL2024

A subsidy application in 15 minutes instead of three trips to the ministry

A state support portal for businesses: national ID sign-in, a document package signed with a qualified digital signature, automatic checks against regional registries and a transparent application status. 11 support programmes in one place.

01 — Challenge

Paper, queues and a month of review

An entrepreneur collected nine documents, drove them to the ministry and waited up to 30 days for a decision. Half the applications came back over formal errors, and the only way to learn the status was by phone.

On the ministry's side the process lived in email and spreadsheets: statutory deadlines were tracked by hand, and the summary report on support programmes took a week to assemble before every board meeting.

02 — Solution

One window with checks before submission

The applicant signs in with the national ID service, part of the form is prefilled from the company registry and regional data, and incompatible support programmes are filtered out before submission. The package is signed in the browser with a qualified digital signature.

Inside sits a workflow builder: every support programme is described as a route of stages, deadlines and roles, so launching a new subsidy is a configuration change rather than a release. Deadlines are calculated automatically and overruns are flagged to the department head.

The system was certified against state information system requirements: separated environments, full action logging, a backup procedure and a security compliance review.

03 — Results
−70%application processing time
42,000applications received in the first year
11support programmes in one window
3 daysto launch a new support programme
04 — How we did it
/01Assessment
A review of 11 regulations, interviews with case officers, a document map and the failure points of the current process.4 WEEKS
/02Design
Technical specification to national standards, the data model and the integration schema for the ID service and regional registries.5 WEEKS
/03Development
10 sprints: the applicant portal, the case officer workspace, the workflow builder and reporting.20 WEEKS
/04Certification and rollout
Acceptance testing, state system certification, training for 60 employees and trial operation on two programmes.7 WEEKS
05 — Stack
GoPostgreSQLReactTypeScriptNational ID (ESIA)CryptoProDockerAstra Linux
«“For the first time a contractor argued with our regulations before development rather than after acceptance. We rewrote two of them — and twice as many applications now make it through.”»
Next case studyMercom — B2B procurementRETAIL · B2B MARKETPLACE · 2023 · 4,200 ACTIVE SUPPLIERS