A bad choice of contractor is not visible during the tender — it shows up in month three: the estimate turns out to have been a sales number, the team on the project is not the one that came to the meeting, and the question “where are we on the deadline” gets answered with a presentation. The good news is that nearly all of it can be surfaced in advance, if you ask the right questions.
We regularly sit on both sides of this table: we sell our own projects and we hire subcontractors for adjacent skills. Below are the questions that have filtered out more risk for us in five years than any rating or portfolio.
Ask about the team, not the company
The company sells the portfolio, but specific people build the project. Ask for the team by name, for their roles on the last two projects, and for how many projects your tech lead runs in parallel. “We will assemble the team after signing” means you will not see it at the start — and will most likely get a junior line-up.
The second marker is who answers the technical questions in the room. If the account manager carries the whole conversation while the engineer stays silent or joins “later”, there will be one more layer of paraphrasing between you and the code.
14 questions that save you six months
- Who exactly will work on this — names, roles, hours per week?
- How many projects does the lead of our team run at the same time?
- How did you estimate the timeline: where do these weeks come from and what is excluded?
- What happens to scope and price if requirements change in week five?
- How often do we see a working product rather than a progress report?
- Which tracker holds the tasks, and will we have access to it?
- Who owns the code, and when does it land in our repository?
- What test coverage do you consider the norm for this kind of product?
- What runs in your CI: linters, tests, dependency vulnerability scanning?
- How does handover to our own team work if we decide to take it in-house?
- Who is on call after release, and with what incident response time?
- Show us three recent projects that went off plan — and what you did about it.
- Can we talk to a client whose project ended badly?
- What would have to happen for you to propose terminating the contract yourselves?
“If the answer to ‘what happens if we part ways in two months’ is ‘that never happens to us’, that is the red flag. It happens to everyone; what matters is what you are left holding.”
Red flags in the answers
The first is an estimate with no questions attached. If the quote arrives a day after a short brief and contains not a single clarification, that is not speed — it is guesswork, and the real timeline will surface later as change orders.
The second is refusing to show intermediate results more often than once a month. A demo every two weeks is inconvenient for the contractor for exactly the reason it is useful to you: a slip becomes visible on the second iteration instead of at acceptance.
The third is vague ownership of the code and infrastructure. The healthy wording: exclusive rights transfer by deed, the code sits in your repository from sprint one, and cloud accounts are registered to your company. Anything else is leverage for the break-up conversation.
How to decide
Compare the scope behind the numbers rather than the totals: half the time a price gap is explained by the cheaper proposal excluding analysis, testing and launch. We broke this down with real ranges in our article on what development costs.
One last thing: start with a small paid engagement. A two-week discovery with concrete deliverables costs under one percent of a project budget and answers all 14 questions better than any negotiation.