“How much does it cost” usually gets answered with “it depends on the task”, which is true and useless. We reviewed 34 estimates from the past two years and reduced them to three ranges you can budget against before discovery even starts.
What an engineering hour is made of
An engineer's rate is not a salary divided by 160 hours. It covers everything that makes the work predictable: analysis and design, code review, testing, infrastructure, on-call after release and the time between projects.
- Billable utilisation is 70–75% of an engineer's time; reviews, hiring and mentoring take the rest
- Analysis and design — 12–18% of the budget, and the first thing cheap estimates cut
- Testing and acceptance — another 15–20%; skip them and the savings come back as incidents
- Infrastructure and DevOps — 8–12%, rising to 20% on high-load products
Three ranges from our estimates
An MVP — ₽5–9M and 10–14 weeks. That is one product scenario end to end, in front of real users: a team of four, no more than two integrations, product analytics from day one.
A platform — ₽18–45M and 6–10 months. Client portals, roles and permissions, dozens of integrations, data migration from a live system. The upper bound is fintech and the public sector, where information security requirements and certification are added to the bill.
A dedicated team — ₽2.8–4.2M per month for five people: four engineers plus a half-time project manager and a tech lead. This format makes sense when the product lives longer than a year and priorities change faster than change orders get signed.
What pushes the range up
Within each range the price comes down to four things, and none of them is “complex design”. First, integrations: every external system means approvals, test environments and someone else's schedule, not just code — in our estimates a third-party API integration runs from 80 to 250 hours. Second, migrating data from a live system: reconciling reference data and running parallel calculations easily adds two months.
Third, information security requirements: state system certification, personal data handling and cryptography add 20–35% to the budget and, more importantly, stretch the timeline through formal testing. Fourth, availability and load: a system that must stay up 99.95% of the time needs redundancy, on-call rotation and load testing — a separate line item, not “server setup”.
Why proposals differ by a factor of two
When two contractors quote ₽6M and ₽12M for the same task, greed is rarely the reason. More often the cheaper proposal simply omits half the work: no analysis, no load testing, no data migration, no launch — all of which will happen anyway, just later and as change orders.
“An estimate is not a price, it is a hypothesis about scope. Compare the scope, not the bottom line.”
How to cut the budget honestly
There are exactly three approaches that work: narrow the scope to a single scenario, buy off the shelf wherever it gives you no competitive advantage (payments, authentication, notifications), and stop engineering for load you do not have yet. We cover this in detail in our article on shipping an MVP in 10 weeks.
What you cannot save on: the people who make decisions, and the time it takes to get the first feedback from users. Both cuts come back with interest.